City of Unley

Unley Oval turf & irrigation upgrade

Project Details
TYPE
Irrigation Project
Turf Project
Client
City of Unley
Timeline
November 2023 – March 2024
About the Project

BTM Undertook the turf and irrigation upgrade at Unley Oval which was a Living Turf specified project.

The works included:

  • Stripping of the existing oval surface and removal offsite.
  • Site earthworks and shaping to new subgrade design levels.
  • Construction of new cricket pitch square.
  • Supply and installation of new irrigation system.
  • Supply and installation of new megaflo and DWV piped drainage system with connection into existing.
  • Supply and installation of 300mm deep sand profile.
  • Supply and installation of 17,000m2 washed Santa ana Maxi Rolls.
  • Grow in maintenance of 12 weeks.